Concrete foundation estimate
Ive been a framer for quite a few years and I'm contemplating building my own house. I was wondering if anybody had an educated guess as to how much a 9 foot pour basement on a 30x50 one story house in central Missouri would be. The back would be stick framed for a full walk out basement. So really would only have 1 50 foot wall and 2 30 foot walls made of concrete. Thanks for taking the time to read my post.
Brandon |
|
|
|
|
|
#2 | |
|
Lic. Builder/GC/Remodeler
Join Date: May 2006
Location: New England
Posts: 7,554
|
Concrete foundation estimateQuote:
__________________
- Build Well - |
|
|
|
|
|
|
#3 |
|
Member
Join Date: Nov 2011
Location: Hartfield VA
Posts: 18,840
|
Concrete foundation estimate
No one here can help you with that. You have to make some calls to local contractors and find out.
The people on this site could be from any part of the world. No one's going to know what labor or materials, soil conditions ECT. are in your area. And if someone does throw a price out what goods it going to do you. It's not going to be right. |
|
|
|
| The Following User Says Thank You to joecaption For This Useful Post: | Gymschu (02-06-2012) |
|
|
#4 |
|
Member
Join Date: Oct 2006
Location: Minneapolis/St. Paul, Minnesota - Latitude 45.057 Longitude -93.074
Posts: 3,357
|
Concrete foundation estimate
You would have to find a local contractor with either 9' high (minimum) or 10 high forms. That may limit the number of contractors that can price it out. Around here that is not a problem, but could be a problem in some areas.
Dick |
|
|
|
|
|
#5 |
|
Newbie
Join Date: Feb 2012
Posts: 2
|
Concrete foundation estimate
Understood. I will have to make some calls on it. Thanks for the advice.
|
|
|
|
|
|
#6 |
|
journeyman carpenter
Join Date: Sep 2011
Location: nova scotia canada
Posts: 2,244
|
Concrete foundation estimate
if your a framer, you obviously have connections to builders.. ask the project manager's for whom you frame the contact number for their foundation guy... .. with that being said.. you might be able to work out a barter deal..
we do it all the time with our other trades.. we trade labor on each others houses |
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Insulating Old Concrete Foundation | bjr149 | Insulation | 7 | 06-04-2011 09:42 PM |
| New Foundation: Minimum height of concrete above openings | axiom10 | Building & Construction | 2 | 04-11-2010 11:26 PM |
| Framing over concrete foundation (above ground) | rovers1973 | Building & Construction | 1 | 04-11-2010 04:49 PM |
| Filling in large openings in concrete foundation | shtoink | Building & Construction | 10 | 12-04-2008 05:03 PM |
| refacing rubble concrete foundation footings | Buck | Building & Construction | 2 | 10-25-2006 01:36 PM |