Hi there, I am building a raised deck (9' in the air), and having a cement pad poured under it for the patio. I will have to have a 12' x 12" hole dug for the piling. The piling will end up being under the patio, and someone told me to use a sonotube for the portion of the piling that will be in contact with the patio...so that the piling and patio will be effectively separate (cement for piling and patio is being poured at the same time). Does this sound appropriate, and will the top edge of the sonotube be showing on the surface of the patio (it will be flush with the surface of the patio). I'm having a stamped concrete finish.

Lincada is offline   Reply With Quote
Old 06-08-2012, 03:16 PM   #2
Member
 
Join Date: May 2012
Location: Sarasota,Florida
Posts: 1,395
Default

cement pad over deck pilings


Quote:
Originally Posted by Lincada View Post
Hi there, I am building a raised deck (9' in the air), and having a cement pad poured under it for the patio. I will have to have a 12' x 12" hole dug for the piling. The piling will end up being under the patio, and someone told me to use a sonotube for the portion of the piling that will be in contact with the patio...so that the piling and patio will be effectively separate (cement for piling and patio is being poured at the same time). Does this sound appropriate, and will the top edge of the sonotube be showing on the surface of the patio (it will be flush with the surface of the patio). I'm having a stamped concrete finish.



Well,first off pilings are usually driven into the ground,are you maybe talking about a pier for a footing??

Canarywood1 is offline   Reply With Quote
Old 06-08-2012, 05:28 PM   #3
Member
 
Join Date: Sep 2011
Location: western Ny
Posts: 1,243
Default

cement pad over deck pilings


A lot of this will depend on the area you are in. If you are in an area where there is frost heave. the sonotube footers/posts will have to come up thru the finished concrete surface. The tops can be even with the finished surface but need to be separate so the slab can move up and down as the seasons change. If you put the slab over the tubes, the slab will try to lift and the tubes will not. The results will be cracking of the slab.

The best way to do this is to set the tubes to the height of the finished patio and fill them with concrete. After they have set for a couple days, pour the patio slab. If everything is done correctly the tops of the slab will be flush with the tops of the tubes. The sonotube cardboard will eventually rot away and leave a nice even joint aroungd the foorings.
danpik is offline   Reply With Quote
Old 06-18-2012, 11:41 AM   #4
Newbie
 
Join Date: Jun 2012
Posts: 2
Default

cement pad over deck pilings


Alright, so I talked with the guys pouring the cement. They recommend that I pour the piling, and the patio over it, all at once (no sonotube). Then when it's set, drill a hole thru the patio into the piling and insert a saddle for the deck post to sit in. They recommended against the sonotube because it will look terrible, and also because I already have one deck post that is cemented into a piling (as in, I have a deck, but I am adding to it, so will be putting in another post for the new deck). Since I already have a post/piling that the patio will be going around/over, I can't really use a sonotube around that one...we do get frost, but the piling will go well below the frost line by about 8 feet. My concern is: does this sound like an ok thing to do...or is it going to crack the patio?
Lincada is offline   Reply With Quote
Old 06-18-2012, 12:49 PM   #5
Newbie Bill
 
Join Date: Dec 2008
Location: Alberta, Canada
Posts: 1,054
Default

cement pad over deck pilings


Quote:
Originally Posted by danpik View Post
The tops can be even with the finished surface but need to be separate so the slab can move up and down as the seasons change. If you put the slab over the tubes, the slab will try to lift and the tubes will not. The results will be cracking of the slab.
I have to agree with danpik.
__________________
Bill

A DIY Noob that knows just enough to be dangerous.
drtbk4ever is offline   Reply With Quote
Old 06-18-2012, 06:34 PM   #6
Member
 
Join Date: May 2012
Location: Sarasota,Florida
Posts: 1,395
Default

cement pad over deck pilings


Quote:
Originally Posted by Lincada View Post
Alright, so I talked with the guys pouring the cement. They recommend that I pour the piling, and the patio over it, all at once (no sonotube). Then when it's set, drill a hole thru the patio into the piling and insert a saddle for the deck post to sit in. They recommended against the sonotube because it will look terrible, and also because I already have one deck post that is cemented into a piling (as in, I have a deck, but I am adding to it, so will be putting in another post for the new deck). Since I already have a post/piling that the patio will be going around/over, I can't really use a sonotube around that one...we do get frost, but the piling will go well below the frost line by about 8 feet. My concern is: does this sound like an ok thing to do...or is it going to crack the patio?

If that pier will be 8 feet below the frost line i'd do it the way your guy's suggest,much neater installation.
Canarywood1 is offline   Reply With Quote
Old 06-18-2012, 08:16 PM   #7
Member
 
Join Date: Sep 2011
Location: western Ny
Posts: 1,243
Default

cement pad over deck pilings


Quote:
Originally Posted by Canarywood1 View Post
If that pier will be 8 feet below the frost line i'd do it the way your guy's suggest,much neater installation.
In Sarasota you might be able to get away with it. In areas where there is frost there is heaving. When the ground freezes it raises up. If the piers were 100' deep the patio slab will still heave up in the winter and the posts will not. Something will have to give and the failure point will be right around the connection area of the slab and the pier

danpik is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Cedar deck help mickbiv Painting 11 08-08-2013 09:21 PM
Pergola over existing deck cpfullback Building & Construction 0 08-04-2011 11:36 AM
Cement board for deck over water Iklake Carpentry 4 07-26-2011 02:17 PM
Leveling a deck denemante Building & Construction 10 08-24-2010 08:11 AM
Pavers Laid over Cement deck cinemod Landscaping & Lawn Care 0 10-10-2009 08:38 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.