4mill poly sheet to hold up fiberglass inulation


My inspection department told me i have to insulate the house and pass that inspection before installing any drywall.

I want to staple 4mil poly sheet to the cieling on my single level home to hold up the rolled in insulation.

Is 4 mill enough? What size and frequency of staples should i use?
I have 16oc joists for my attic/cieling.

Its gonna get cold soon and my furnace will blow up so i want to get this going.
Any concerns anybody can tell me? thx allot fo any help.

john_bry is offline   Reply With Quote
Old 12-16-2012, 01:42 PM   #2
Exterior Construction
 
Windows on Wash's Avatar
 
Join Date: Aug 2011
Location: Washington DC Metro Area (VA, MD, DC)
Posts: 6,608
Rewards Points: 2,500
Default

4mill poly sheet to hold up fiberglass inulation


Where is the home located?

Windows on Wash is offline   Reply With Quote
Old 12-16-2012, 02:51 PM   #3
Member
 
Join Date: Sep 2012
Posts: 41
Rewards Points: 25
Default

4mill poly sheet to hold up fiberglass inulation


chicago illinois
john_bry is offline   Reply With Quote
Old 12-16-2012, 06:07 PM   #4
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 26,972
Rewards Points: 3,060
Default

4mill poly sheet to hold up fiberglass inulation


The poly is just a vaper barrier, not to hold up the insulation. Do not install the insulation until the sheetrock is up.
joecaption is online now   Reply With Quote
Old 12-17-2012, 12:04 AM   #5
Member
 
Join Date: Mar 2012
Location: Lynnwood, WA
Posts: 729
Rewards Points: 500
Default

4mill poly sheet to hold up fiberglass inulation


Joe missed this part...
Quote:
Originally Posted by john_bry View Post
My inspection department told me i have to insulate the house and pass that inspection before installing any drywall.

What about securing the insulation with insulation supports? http://www.lowes.com/ProductDisplay?...llow&cId=PDIO1
Seattle2k is offline   Reply With Quote
Old 12-17-2012, 12:28 AM   #6
Member
 
Join Date: Dec 2008
Location: Fairbanks, AK
Posts: 1,847
Rewards Points: 1,000
Default

4mill poly sheet to hold up fiberglass inulation


i don't think a vapor barrier is necessarily a good idea in chicago. why do you feel you need it? if the insulation (i assume fiberglass??) is loose, i would never try to hold it w/ 4 mil. i think, if something is needed, tyvek would be a better choice; it is far tougher and much more vapor permeable. if you don't HAVE to have some kind of sheet stuff, i'd suggest air sealing using the airtight drywall approach. that will require that all electrical boxes, light boxes, etc, be air tight as well. etc.
jklingel is offline   Reply With Quote
The Following User Says Thank You to jklingel For This Useful Post:
Windows on Wash (12-17-2012)
Old 12-17-2012, 07:45 AM   #7
Exterior Construction
 
Windows on Wash's Avatar
 
Join Date: Aug 2011
Location: Washington DC Metro Area (VA, MD, DC)
Posts: 6,608
Rewards Points: 2,500
Default

4mill poly sheet to hold up fiberglass inulation


Don't like poly as a vapor barrier either.

Get the insulation hold ups or use and insulation like Roxul that doesn't need it.

Like JKlingel said, make the drywall airtight.
Windows on Wash is offline   Reply With Quote
Old 12-17-2012, 10:49 PM   #8
Registered User
 
Join Date: Mar 2009
Posts: 9,968
Rewards Points: 2,000
Default

4mill poly sheet to hold up fiberglass inulation


For your Zone 5, either a vapor barrier (poly) or vapor retarder (asphalt-coated paper faced is acceptable per minimum code to meet the 1/300 NFVA for attics; http://publicecodes.cyberregs.com/ic...?bu2=undefined

Notice; meeting the 1/150 rule doesn't require a vapor barrier/retarder (if the venting is correct).

Ask your local AHJ if poly is required or is that something you are suggesting? The 2012 Code changes to Zone 6-8 only for minimum venting/vent placement/retarder/barrier required; http://publicecodes.cyberregs.com/ic...2_8_sec006.htm

From Building Science;
"In addition to an air barrier at the ceiling line, a Class II vapor retarder (see sidebar) should be installed in Climate Zones 6 or higher (see Map 1).
Class I vapor retarders (i.e. vapor barriers – see sidebar) can be installed in vented attic assemblies in Climate Zones 6 or higher (see Map 1) but should be avoided in other climate zones as top side condensation can occur in summer months during air conditioning periods." From; http://www.buildingscience.com/docum...on?full_view=1


I'd rather see Tyvek over the insulation, but not if you air-seal the attic first. Don't leave air pockets/cavities under the insulation after installing drywall ceiling from the wires, the insulation requires contact with drywall. Ask them if you can use unfaced batts after drywall, many departments do. They can check at final inspection.


Gary
PS. A good read; http://www.brainerdhomeinspection.com/roofve~1.pdf

__________________
If any ads are present in my answer above, I do not condone/support/use the product or services listed, they are there against my permission.
Gary in WA is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off





Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.