Getting ready to remud the bathroom (had to peel off all the paint down to the brown paper) and have a question. The tape in 2 of the corners was partially pulled away from the wall and after pulling all the way off, found some cracking and and indentatons behind the tape on what appears to be the joint compound previously applied. Would reapply the joint compound when I retape be sufficient to remedy this?

Can I also recap the steps in this process (just want to be sure I do it right). Reapply tape, drywall primer, joint compound, texture (yes I live in a region that loves our texture), Zinseer 1-2-3 primer, then paint?

Thanks for your help.
debbieindy is offline   Reply With Quote
Old 12-11-2011, 07:16 PM   #2
retired union carpenter
 
Join Date: Nov 2011
Location: PA
Posts: 323
Send a message via Yahoo to coupe
Default

Mudding project


hi, without an on site look see, it sounds as though there were significant gaps between drywall at corners? and cracks were filled and corner taped before ample drying time? 1/2" or 5/8" of compound could take a week to completely dry.

a couple of skim coats could do you good? if not, I'd flat tape the bad sides, then skim coat two coats allowing each to dry completely using a 6" knife. before running corner tape.

when running corner tape, run knife along bad side first keeping knife tight to good side. then two skim coats on top and sanding when dry.

from another post, it seems as though sanding dust was left on wall causing bubbles and such? you might want to wipe walls down before painting. paint covers the dust, but doesn't soak into drywall properly.

I always suggest two coats of good flat paint, before any type of glossy finish is applied. it's the glossy that tends to bubble and pull away from drywall, if you like texture? feel free! I prefer flat finish for reason stated above. to each their own I guess

as always good luck. if helps? great! if not? ignore

coupe
coupe is offline   Reply With Quote
Old 12-11-2011, 07:22 PM   #3
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 24,521
Default

Mudding project


I've got to be missing something. If it's down to the backing why would you not just redo the drywall? Far faster then tying to recoat and all cleaning up all the sanding dust. Texture in any bathroom is a very bad idea.
Painting, cleaning, keeping mold from growing will be a night mare.
joecaption is online now   Reply With Quote
Old 12-12-2011, 06:49 AM   #4
Newbie
 
Join Date: Nov 2011
Posts: 17
Default

Mudding project


Actually, I pulled all the tape on both walls after looking at the joints. The second wall resulted in about a 1/4" separation between the two walls at the bottom, as it tapers up about 1/4 of the way up the wall. Should I fill that gap in with compound and let dry for about 1 week like Coupe suggested on the other post or does this sound like a wall demolish? This just keeps getting better doesn't it??

Thanks for your help
debbieindy is offline   Reply With Quote
Old 12-12-2011, 10:32 AM   #5
retired union carpenter
 
Join Date: Nov 2011
Location: PA
Posts: 323
Send a message via Yahoo to coupe
Default

Mudding project


Actually, I pulled all the tape on both walls after looking at the joints. The second wall resulted in about a 1/4" separation between the two walls at the bottom, as it tapers up about 1/4 of the way up the wall. Should I fill that gap in with compound and let dry for about 1 week like Coupe suggested on the other post or does this sound like a wall demolish? This just keeps getting better doesn't it??

Debbie, if it's only a 1/4" crack? you can fill it. if there is a backing behind it? if not, you'll be filling till the wall is full! I think you can fill the gap with fresh unmixed mud, fill full but not push mud through the wall.

then add your paper tape to push mud in deeper, running your knife along the good side. the mud will adhere to the tape and keep mud from falling in.

as it dries the mud will suck the tape into the crevice. probably not a week to dry but give it a couple days. it will take a couple extra cats to fill in where the tape pulled in. but, most likely not require full demolish?

no it doesn't keep getting better! it keeps getting worse. that's why remodel jobs are so hard to bid on. the unseen takes the most time, time is money.

as always best of luck to you

coupe
coupe is offline   Reply With Quote
Old 12-13-2011, 07:47 PM   #6
Newbie
 
Join Date: Nov 2011
Posts: 17
Default

Mudding project


So are you suggesting putting the tape on when I'm filling the gap or are you suggesting filling the gap, letting it dry, remud and place the tape on the "filled in" space?
debbieindy is offline   Reply With Quote
Old 12-13-2011, 09:04 PM   #7
retired union carpenter
 
Join Date: Nov 2011
Location: PA
Posts: 323
Send a message via Yahoo to coupe
Default

Mudding project


fill the crack and run the tape at same time. allow to dry completely then two coats feathered over the tape.

as always, just my thoughts

good luck
coupe
coupe is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
My new carport & workshop project mgp roofing Project Showcase 64 01-13-2014 11:57 AM
Attic project - Would like opinions whataboutj Insulation 6 06-29-2011 03:07 PM
Anyone used a project manager instead of GC? pulpit Building & Construction 10 02-11-2011 10:08 AM
Project adding 3-phase power to a tenant finish project bnharbor Electrical 5 11-11-2010 05:39 AM
My basement project - a 2 year project. HABSFAN2006 Project Showcase 14 07-12-2009 09:30 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.