DIY Chatroom -  DIY Home Improvement Forum
    DIY Forum     DIY Blogs     Photos     Woodworking     Advertise     Contact Us  

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!
Go Back   DIY Chatroom - DIY Home Improvement Forum > Home Improvement > Drywall & Plaster

Reply
 
Thread Tools Search this Thread Display Modes
Old 11-03-2012, 11:11 PM   #1
Member
 
Join Date: Dec 2011
Location: B.C. Canada
Posts: 1,975
Default

horizontal or vertical.


Can only fit 8' sheets down my basement stairs. Even 10' wont go.
Normally I run them horizontally but in this case I wonder if I should go vertical?

mae-ling is offline   Reply With Quote
Join DIYChatroom.com

Join the #1 DIY Forum Today - It's Totally Free!

DIYChatroom.com - Are you about to start a new home improvement task and need some help? Do you need advise on what products to buy? Or maybe you can give others some advice? No matter where you fit in you'll find that DIY Chatroom is a great community to join. Best of all it's totally free.

Join DIYChatroom.com - Click Here
JOIN FOR FREE


Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. DIYChatroom.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any home improvement task!
Old 11-03-2012, 11:26 PM   #2
Member
 
Join Date: Nov 2011
Location: Hartfield VA
Posts: 18,163
Default

horizontal or vertical.


It's done all the time, just more seams to deal with, just make sure there 1/2" up off the slab.
Make sure the first piece in the corner is plumb or your going to be fighting all the rest.

joecaption is online now   Reply With Quote
Old 11-04-2012, 01:05 AM   #3
Member
 
Join Date: Dec 2011
Location: B.C. Canada
Posts: 1,975
Default

horizontal or vertical.


In this case it isn't more seems to deal with, because I can only use 8' sheets.
If running horizontal on a 12' wall I would have 2 - 4' butt joints and 12' of tapered joint = 20' of taping.
If run Verticle I would have 2-8' tapered joints= 16' of taping and no butt joints.

Normally I would use 12' sheets and only have the one 12' horizontal joint at a nice taping height. But can't get them down stairs.
mae-ling is offline   Reply With Quote
Old 11-05-2012, 07:49 PM   #4
Member
 
Join Date: Feb 2012
Location: ontario canada
Posts: 545
Default

horizontal or vertical.


you should always try to put your wall board vertically. tapered edges are always easier to mud then a butt and are less noticeable with light shining in.
princelake is offline   Reply With Quote
Old 11-06-2012, 12:41 AM   #5
Member
 
Join Date: Dec 2011
Location: B.C. Canada
Posts: 1,975
Default

horizontal or vertical.


I always try to use longest sheets possible and run horizontal so only 1 tapered seam. way better then a bunch of vertical seems.
Previously worked for a drywaller.
mae-ling is offline   Reply With Quote
Old 11-06-2012, 05:33 PM   #6
Member
 
Join Date: Feb 2012
Location: ontario canada
Posts: 545
Default

horizontal or vertical.


currently work doing drywall and painting for a living
princelake is offline   Reply With Quote
Old 11-06-2012, 05:35 PM   #7
Member
 
Join Date: Nov 2012
Posts: 43
Default

horizontal or vertical.


Quote:
Originally Posted by princelake View Post
currently work doing drywall and painting for a living
I wouldn't pay your company if I found out you stood the boards up.

You always railroad in a house.
Gensetter is offline   Reply With Quote
Old 11-06-2012, 06:17 PM   #8
Member
 
Join Date: Dec 2011
Location: B.C. Canada
Posts: 1,975
Default

horizontal or vertical.


Prince - why stand vertical if room is less then 12'? at 12' you would only have 1 - 12' seam, tapered edges.
Vertical would have a minimum of 16' and possibly 24' depending on stud layout, and harder/slower to tape from floor to ceiling on the 2 or 3 joints as compared to the 1-12'
Over 12' and I can see some logic to the no butt seams.

In my case I can only use 8' sheets as that is all I can fit down the stairs so I will stand vertically unless the wall is 8' or less, then I will go horizontal.
4' or under is 1 sheet stood vertical.

Last edited by mae-ling; 11-06-2012 at 06:37 PM.
mae-ling is offline   Reply With Quote
Old 11-06-2012, 09:28 PM   #9
Member
 
Join Date: Feb 2012
Location: ontario canada
Posts: 545
Default

horizontal or vertical.


installing the sheets vertically is much easier if you are on your own and you dont need second hand to handle a 12' sheet. vertical seams are less noticeable when light is shining in from outside or down from a ceiling light and table lamps on coffee tables shine right on your work. it may take a little more work but the finished product always comes out better.
princelake is offline   Reply With Quote
Old 11-06-2012, 09:57 PM   #10
Member
 
Join Date: Nov 2012
Posts: 43
Default

horizontal or vertical.


Quote:
Originally Posted by princelake View Post
installing the sheets vertically is much easier if you are on your own and you dont need second hand to handle a 12' sheet. vertical seams are less noticeable when light is shining in from outside or down from a ceiling light and table lamps on coffee tables shine right on your work. it may take a little more work but the finished product always comes out better.
This is completely opposite from the truth.

First of all, what is easier for you really doesn't matter, doing the job right is what matters. Second, standing boards up makes the vertical seems VERY noticeable, which is why a professional would never do it. And finally, the finished product is worse when standing the boards up.
Gensetter is offline   Reply With Quote
Old 11-06-2012, 10:18 PM   #11
Member
 
Join Date: Feb 2012
Location: ontario canada
Posts: 545
Default

horizontal or vertical.


your struggling,sweating and breaking your back so makes it right?? how is all finished seams worse???

bahhhh whatever, i might as well talk to the wall. keep on trucking on the "railroad"
princelake is offline   Reply With Quote
Old 11-06-2012, 10:22 PM   #12
Member
 
Join Date: Nov 2012
Posts: 43
Default

horizontal or vertical.


Quote:
Originally Posted by princelake View Post
your struggling,sweating and breaking your back so makes it right?? how is all finished seams worse???

bahhhh whatever, i might as well talk to the wall. keep on trucking on the "railroad"
I'm sorry, but you are dead wrong.

Nevermind the fact that you are wrong about what you said, but your attitude is horrendous. You give tradesmen a bad name.

The customer wants the job done right, if your back can't handle it, go find another line of work. But do NOT do it the wrong way because it's a bit easier, that's disgusting.
Gensetter is offline   Reply With Quote
Old 11-06-2012, 10:45 PM   #13
Member
 
Join Date: Feb 2012
Location: ontario canada
Posts: 545
Default

horizontal or vertical.


mr. big shots that think they know it all give me a bad attitude. its the blind leading the blind. i have a very good attitude with my customers and they love my work, i never have any issues. i use the best quality products and i work hard to make things right. my back can handle it with no issues but all it takes is to lift one sheet wrong and you'll end up in an emergency room. work smarter not harder. 8' sheets are simply much easier to handle for everyone. you can go skim out your nice butt joints everywhere you keep your customers happy with all that dust from sanding them.
we arent getting anywhere arguing so im done. i hope you can sleep at night knowing some dude out there stands his sheets up.
princelake is offline   Reply With Quote
Old 11-06-2012, 10:48 PM   #14
Member
 
Join Date: Nov 2012
Posts: 43
Default

horizontal or vertical.


Quote:
Originally Posted by princelake View Post
mr. big shots that think they know it all give me a bad attitude. its the blind leading the blind. i have a very good attitude with my customers and they love my work, i never have any issues. i use the best quality products and i work hard to make things right. my back can handle it with no issues but all it takes is to lift one sheet wrong and you'll end up in an emergency room. work smarter not harder. 8' sheets are simply much easier to handle for everyone. you can go skim out your nice butt joints everywhere you keep your customers happy with all that dust from sanding them.
we arent getting anywhere arguing so im done. i hope you can sleep at night knowing some dude out there stands his sheets up.
And this ^ is why you do not hire people off of Craigslist.
Gensetter is offline   Reply With Quote
Old 11-06-2012, 10:51 PM   #15
Member
 
Join Date: Mar 2012
Location: far sw sub chicago
Posts: 1,796
Default

horizontal or vertical.


imo. do whatever it takes to minimize/eliminate butt joints.

__________________
DIY'er, out of necessity. if i did this for a living, i would make about $3.50 an hour
To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.

i didn't make this world. i just live in it.
be careful of whom you make fun of. one day, that could be you...
Fix'n it is offline   Reply With Quote
The Following 2 Users Say Thank You to Fix'n it For This Useful Post:
mae-ling (11-06-2012), princelake (11-06-2012)
Reply


-->
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Hang drywall vertical or horizontal nickm1024cobra Drywall & Plaster 54 03-30-2011 12:37 PM
Max horizontal load on vertical basement support beam supa Building & Construction 8 02-27-2011 02:51 PM
Hanging drywall - Vertical or Horizontal? RobbL Building & Construction 20 09-14-2010 07:48 PM
Vertical or horizontal installation Tom241953 Drywall & Plaster 7 07-20-2010 08:53 PM
horizontal or vertical plywood sheathing. Clutchcargo Building & Construction 6 07-12-2009 02:51 PM


Top of Page | View New Posts


All times are GMT -4. The time now is 03:43 PM.


© 2003 - 2010 The Building Network LLC