What is the proper way to hang drywall around the water hearter door frame (36x80inches)?

Should I purchase 1 sheet of 4x8. Cut them in half and install the two 4x4 of drywall horizontally, then notch drywall around openings. Or can I use one sheet of 4x8 vertically and notch drywall around openings.

Also what would be the proper procedure to install drywall on a 1x8 feet 22.5 degree wall( next to water heater). Just install it vertically or horizontally.

See attached pic.

Note: I'll install drywall on the rest of basement room using 4x12 horizontally.

Arey85 01-04-2010 09:56 PM

the way i do all my houses is- if its a small wall (like the inside of a closet) cut a peice to go from the top of the wall to the bottom of the header, then use 2 skinny rips to go down both sides. As for the angled wall stand it up the long way. the rule of thumb is if you can cover the entire area of a wall with one sheet....do it. theres no reason to create more joints. Use the leftover from that sheet to do the sides of your door. Also in the basement, are you drywalling the ceiling or putting an acoustical ceiling?

avtck 01-04-2010 10:07 PM

Hi Arey.

Yes. I'm planning to sound proof the ceiling in the following way:

a) Install sound proof insulation (woolrock ,Roxul AFB or safe and sound) + sound stop or Homasote board + 5/8 drywall + resilent channel

b) Same as above, but replacing sound board with an extra 5/8 drywall board.

tpolk 01-04-2010 10:43 PM

I hate seeing door openings with no jacks, not only is there nothing to nail your trim to, if you dont use a full sheet and have a joint at the header you will most likely crack there if kingstud moves. plus nutin to nail base to at trim. what keeps the single piece header up?

Gary in WA 01-04-2010 11:11 PM

Most door openings are 82-82-1/2" rough, may want to check on that. As you know, now's the time to run the outside air supply to the gas appliances, if required: http://www.mybuildingpermit.com/Insp...0checklist.pdf

I enjoyed this on finishing basements, I hope you will too: http://www.pwcgov.org/docLibrary/PDF/005575.pdf

Be safe, Gary

avtck 01-05-2010 04:37 AM

tpolk --> Thank you for pointing out "door openings with no jacks". I'll make sure to add them to that door. All other doors have them.

Since the door frame was build without the use of the 2x8 header, do you think would be best to modify the frame, by adding the header? Note: This is a non supporting wall that will host louvered doors.

gbr in WA --> the current height is 82-3/4 (thank you for the links)

Arey85 --> thank you for your input.

tpolk 01-05-2010 07:21 AM

if you're going to use the flat 2x4 header i would at least double it.