Drywall hung from the bottom up


What's the purpose of hanging drywall starting with the top panel? I really need to hang a lower panel, and I don't want to try to finish the electrical rough in, since I don't even know what's going in on that wall. Why couldn't I hang the bottom panel first?

benjamincall is offline   Reply With Quote
Old 08-06-2011, 07:54 PM   #2
Member
 
firehawkmph's Avatar
 
Join Date: Dec 2009
Location: Near Cleveland, Ohio
Posts: 1,584
Default

Drywall hung from the bottom up


Ben,
The ceilings are normally hung first. Then the top row as you call it, is pushed right up against the ceiling drywall, providing a snug fit. Ceiling heights are usually framed 1" higher than the finished height call for. This allows either a 1/2" or 5/8" for the ceiling drywall with the balance left over where the bottom row meets the floor. This allows enough wiggle room to get the drywall panels in without running into a tight spot where maybe there is a hump in the floor, etc. The base molding covers the small gap at the floor joint.
Mike Hawkins

firehawkmph is offline   Reply With Quote
Old 08-06-2011, 08:10 PM   #3
Member
 
Join Date: Apr 2008
Location: NJ
Posts: 445
Default

Drywall hung from the bottom up


Mike,

I'll try to guess at where the light bar/walls sconces will go. I'm not big on pop-in boxes for heavy fixtures. I'm probably going to rip out the drywall on the ceiling at a later date, but I need to get in at least the bottom wall panel right now, so I can get the lavatory back in. I added at least 1-3/4" to the floor height when I put in marble tile, so I'll have to rip down one of the panels. Should I rip down the top edge of the top panel and put it in later?
benjamincall is offline   Reply With Quote
Old 08-06-2011, 08:12 PM   #4
Member
 
Join Date: Apr 2008
Location: NJ
Posts: 445
Default

Drywall hung from the bottom up


Could I rip out the drywall on the back side when I'm ready to install the electrical boxes and use angle brackets to install plywood to secure pop-in boxes?
benjamincall is offline   Reply With Quote
Old 08-06-2011, 09:14 PM   #5
Member
 
firehawkmph's Avatar
 
Join Date: Dec 2009
Location: Near Cleveland, Ohio
Posts: 1,584
Default

Drywall hung from the bottom up


Ben,
You could either rip the bottom of the bottom sheet like you mentioned, or rip the top of the upper sheet when you get ready to put it back in. If you don't want to use the cut in boxes, screw a 2 x 4 in between the studs and use a metal pan for your box. I would figure out where my lights are going and do it all from the front side. Don't cut out the back and try to finagle something in there.
Mike Hawkins
firehawkmph is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
First-timer drywall install-LONG- Axhammer Drywall & Plaster 8 04-17-2011 09:02 AM
Drywall over Drywall.. NoviceHandyman Drywall & Plaster 6 01-10-2011 08:32 PM
Suspend Drywall on wooden I-Beams rickkeeter Drywall & Plaster 10 11-12-2009 09:28 PM
Good ways to run pegboard up to drywall? upthemaiden Drywall & Plaster 1 03-09-2009 01:12 PM
Framing and Drywall questions haysdb Building & Construction 5 11-04-2005 07:11 AM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.