Go Back   DIY Chatroom Home Improvement Forum > Home Improvement > Drywall & Plaster

CLICK HERE AND JOIN OUR COMMUNITY TODAY...IT'S FREE!

Reply
 
Thread Tools Search this Thread Display Modes
Old 01-20-2010, 05:23 PM   #1
Member
 
Join Date: Jan 2008
Location: Alabama
Posts: 608
Rewards Points: 0
Share |
Default

Attach Drywall through plywood


I recently stiffened my floor joists in a bouncy upstairs room. Now I want to hang drywall from these floor joists for finishing in the basement downstairs.

When I stiffened the joists, I sistered some of the 2x8 joists with 2x10s. The other joists, I stiffened by attaching 2x4s laid flat to the bottom of the joist (to create something like an I-beam... or up-side-down T beam).

The result is that the bottom of the 2x10s hang below the level of the 2x4s by about 1/2". To get the joists "level" I want to rip some 1/2" plywood and attach it to the underside of the 2x4s.

Now the 2x4s have been attached in such a maner that they will be able to support the load of the drywall (they were attached with a combination of liquid nails, 3" long wood screws, and 3" nails). So from a support stand point, I want the drywall to be supported by the 2x4s rather than the plywood.

My plan is to loosely attach the plywood (perhaps just a few finishing nails to hold them in place) and then attach 5/8" drywall with 2" drywall screws.

Anything wrong with this plan? Any issues with plywood as a backer to the drywall?

HooKooDooKu is offline   Reply With Quote
Old 01-20-2010, 06:04 PM   #2
Member
 
Join Date: Nov 2009
Location: central virginia mountains
Posts: 1,857
Rewards Points: 0
Default

Attach Drywall through plywood


I would nail ply secure no reason to not and more solid b more better imo

tpolk is offline   Reply With Quote
Old 01-20-2010, 10:05 PM   #3
Member
 
Join Date: Jan 2008
Location: Alabama
Posts: 608
Rewards Points: 0
Default

Attach Drywall through plywood


Quote:
Originally Posted by tpolk View Post
I would nail ply secure no reason to not and more solid b more better imo
Well, now when I say "loosely", the idea would be that the plywood would not be mounted in a "structual" way (i.e. not designed to hold a load).

It would be sound against the bottom of the joists, but the only thing holding it in place (until drywall screws go through it) would be 1.5" long finishing nails. But since the nails would all be vertically oriented, if you attempted to pull DOWN on the plywood, it (or those finishing nails) would likely slide right off.

The idea is that the 2x4 studs firmly attached to the joists would be the support structure. The plywood is just a spacer.
HooKooDooKu is offline   Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Hanging drywall Question avtck Drywall & Plaster 6 01-05-2010 06:21 AM
Large drywall patches - best way to fix? Screw them to what? Scott99999 Drywall & Plaster 6 11-19-2009 04:34 PM
Suspend Drywall on wooden I-Beams rickkeeter Drywall & Plaster 10 11-12-2009 09:28 PM
Tiling - Gap in plywood (sub)floor mcg Remodeling 5 01-15-2009 04:21 PM




Top of Page | View New Posts

Copyright © 2003-2014 Escalate Media. All Rights Reserved.