Warning: The topics covered on this site include activities in which there exists the potential for serious injury or death. DIYChatroom.com DOES NOT guarantee the accuracy or completeness of any information contained on this site. Always use proper safety precaution and reference reliable outside sources before attempting any home improvement task!
03-20-2005, 09:51 AM
|
#2
|
|
Long-Time DIYer
Join Date: Mar 2005
Location: On Albemarle Sound In Northeastern NC
Posts: 1,041
My Photos
|
The rotted floor damage may have been caused by just shower and bath users dripping water between the tub and floor, or through the stick-on floor tiles, over time. Any water hitting the floor from whatever source will do it eventually.
I don't know how your particular floor is built, but usually there is a subfloor layer, a "vapor barrier" layer of roofing (tar) paper if it is over a crawlspace or unfinished basement, and then the flooring level that the finish flooring is installed on.
In my case for instance, which is typical, there is 3/4" plywood subflooring on the joists, a layer of overlapped tar paper (downstairs bath only - over crawlspace), a layer of 5/8" plywood flooring, 1/2" cement board and then ceramic tile.
You also probably have rot damage under the tub, but if the tub is sitting securely, I wouldn't worry about it right now.
You may need to remove everything but the tub to get all of the damaged flooring out.
To remove the bad flooring, you will need safety glasses, a circular saw (use an old blade - you WILL hit nails), a crowbar, a prybar, claw hammer, etc. Use a reciprocating saw if up close to the tub or a wall.
Adjust the depth of the circular saw blade so that it cuts only through the flooring, and NOT into the top of the floor joists. You may want to start a layer at a time. Be careful with a recip saw.
Cut along the centers of the floor joists, so that you have something to nail or screw the new subflooring and flooring to. If the top of the joists are badly damaged, you can sister another joist along side of the old one with long screws. Install 14.5" crosspieces of lumber the same size as the joists between the joists, half under the old flooring for the same reason.
I always use pressure-treated lumber and plywood when repairing bathroom, kitchen or utility room floors, but that's your call.
To make it easier to pry out and remove, I don't cut more than 2' X 16" pieces of the damaged flooring, but go back with as full sheets of plywood as you can, and stagger the joints of the layers.
Good luck!
Mike
Last edited by Mike Swearingen; 03-20-2005 at 09:56 AM.
|
|
|
03-20-2005, 10:05 AM
|
#3
|
|
Member
Join Date: Nov 2004
Location: Fredericksburg, Va
Posts: 32
My Photos
|
Tallycat,
It sounds like you have a good handle on the situation. If I understand what you're describing, that's the course of action I would take. You really want the floor to be structuraly sound, so replacing any rotted wood is mandatory. Between the 2x8's and 1" plywood I think you'll have a good solid base from which to work.
Then, depending on the type of floorcovering you choose, an appropriate underlayment. By fuax stone laminate do you mean real laminate floor? Like Pergo or QuickStep?
Absolutely pull the toilet, the sink too if it's not too much trouble, but always the toilet and replace after new floor is installed.
You really do need to find the cause of the problem. Making an assumption and being wrong can be an expensive mistake. I could very well be from the leaking tub, or major moisture underneeth. If you have a crawlspace go under there and see what's happening. You may need to fix that area before moving foward.
Good luck,
Don
|
|
|
03-20-2005, 01:37 PM
|
#4
|
|
Member
Join Date: Nov 2004
Location: Fredericksburg, Va
Posts: 32
My Photos
|
I should also mention that whenever dealing with water-damaged wood, ventilate as much as possible. Wear a good dust mask as well. Mold can be quite dangerous when stirred up and released into the air.
Don
|
|
|
03-20-2005, 03:50 PM
|
#5
|
|
Newbie
|
More investigation on rotten subfloor...
Thanks for the quick replies and good info.  I went under the house again this morning to do some more investigating and found a small drip running down the toilet drain pipe. I saw another small drip running down the back of the tub. I have caulked around the tub spout - but did not caulk around the very bottom (because there was a hole there...  ) So I guess now any water that hits the spot flows to the bottom and down behind the tub. I guess I should caulk all the way around, huh? As for the toilet, I'm not sure if it is a leak somewhere in the pipe, the wax ring, etc... What is the best way to diagnose, or will I more than likely fix the problem when I pull the whole thing out? Back to the rotten floor... I think I can handle tearing out the subfloor in the bathroom (that is the only thing between the stick on tiles and the floor joists) but what about the part against the wall? What about on the other side of the wall in the kitchen? I don't see anything on the kitchen side like I do on the bathroom side (remember - hole straight through to the ground in bathroom) but the wall rests between two joists (~21" apart). I've still got a few questions about how to install these pressure treated 2X8's I got. Am I supposed to run the deck screws all the way through the joists and into the perp. 2X8? Thanks for the sage advice and patient approach.
|
|
|
03-20-2005, 06:41 PM
|
#6
|
|
Long-Time DIYer
Join Date: Mar 2005
Location: On Albemarle Sound In Northeastern NC
Posts: 1,041
My Photos
|
Is the toilet "loose"? Sounds like you have a wax ring leak.
You also have a supply line or faucet leak around the tub, if it is steadily leaking when nothing is draining.
Caulk is not the way to repair those.
You need to open up whatever you need to, to find the leak and fix it, or your flooring repair is for naught.
When sistering joists, all that you're doing is screwing or nailing them side-by-side at the same exact floor level, and supported the same way. Nail or screw the screws completely through the new joist and at least 2/3 the way into the adjoining, existing joist.
Let us know what you find. If you run into anything that you need help with, just ask. That's why we're here. We'll be glad to help you.
Mike
Last edited by Mike Swearingen; 03-20-2005 at 06:51 PM.
|
|
|
03-20-2005, 07:45 PM
|
#7
|
|
Newbie
|
Rotten subfloor -- More info and questions
I would not say the toilet is loose. In fact, I recently paid somebody to "stabilize" but don't remember seeing anything on the invoice about replacing the wax ring.
I went under the house right after a shower had been taken today and I would not say the leak is steady. The only thing I did notice when I was under the house (not right after a shower) were the drops of water on the toilet drain pipe.
Should I caulk around the entire tub spout?
I want to do this right, just need to make sure I am covering all my bases.
What would be some of the reasons for sistering the joists? They don't appear to be damaged. I was under the impression that I would be putting in supports perpendicular to the joists to support the subfloor in areas where there is not a joist.
How much of the subfloor should be replaced? Obviously the visibly rotten spots, but how much is too much? Thanks for the help! 
|
|
|
03-20-2005, 10:51 PM
|
#8
|
|
pro flooring installer
|
If this is a small bath 5 x 5 then go ahead and tear it all out and start over not worth picking and choosing in this small area take everything out as suggested and cut the entire subfloor out and replace.
I would worry more about the choice of flooring for this area than the what part of the subfloor to tear out.In effect what you are puttingin is a laminate floor with a stone finish i think if i were you i would opt for the real stuff and forget this product altogether it is still new and i'm hearing bad things about it,haven't done any yet but the ones who have don't like it.
Sounds like you are in good hands here
Quote:
|
Originally Posted by tallycat77
I would not say the toilet is loose. In fact, I recently paid somebody to "stabilize" but don't remember seeing anything on the invoice about replacing the wax ring.
I went under the house right after a shower had been taken today and I would not say the leak is steady. The only thing I did notice when I was under the house (not right after a shower) were the drops of water on the toilet drain pipe.
Should I caulk around the entire tub spout?
I want to do this right, just need to make sure I am covering all my bases.
What would be some of the reasons for sistering the joists? They don't appear to be damaged. I was under the impression that I would be putting in supports perpendicular to the joists to support the subfloor in areas where there is not a joist.
How much of the subfloor should be replaced? Obviously the visibly rotten spots, but how much is too much? Thanks for the help! 
|
|
|
|
03-22-2005, 09:33 PM
|
#10
|
|
pro flooring installer
|
If you can get the plywood out without any damage or loosenimg of the tub then do it.
With the sistering of the joists you can go a little thinner on the plywood use either 3/4 o.s.b. or exterior grade plywood.That should do just fine then the hardi or durock and then the tile.
After is all the plywood and durock or hardi is in check the toilet flange and see if it needs to lowered or raised,check that do that before you put all that stuff in,got ahead of myself there  .
You can cut the perimeter of the room and get as close to the walls as you can and then chisel or take a sawsall to it and get the rest.
Let us know if we can help some more 
__________________
-Floorman
Floorlayers union local 1310
|
|
|
03-22-2005, 10:18 PM
|
#12
|
|
pro flooring installer
|
Yes,pull all that you can out of the way and then cut the pipe for the toilet flange as you suggested and then reattach.
The piping for the sink is less crucial but if it needs to be done then do it,probably will not make that big a differencs as far as that goes.
Stagger the plywood over the joists at half sheets making sure you stop and start a sheet in the center of the joist so that you get the support needed for that sheet,put the bigger piece in the area that will get the most traffic and the smaller piece behind the commode and the sink.
Use 1 1/2 deck screws to fasten the plywood and use construction adheasive on the joists before you drop the plywood to fasten it.
Use 1/2 rock or hardi and screw or nail every 2" on the seams and every 4 to 6" in the field,and don't forget the unmodified thinset under the c.b.u. use 1/4 notch to apply that,and make sure the seams of the c.b.u. lap the joints on the plywood by at least 6".
Let us know if there is anything else 
__________________
-Floorman
Floorlayers union local 1310
|
|
|
| Thread Tools |
Search this Thread |
|
|
|
| Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
|